A-Z Solutions was contracted to remediate a 350,000 square feet rubber manufacturing facility in the Ohio. As part of the project, the crew was to create a negative pressure field around machine pits that were constructed virtually on top of the underground water table. The installation had to be completed within 30 days from start date. …
The project was 20,000 square feet of a million square foot manufacturing facility in North Carolina. Our goal was to design and install a working vapor intrusion system in under a week. Communication testing showed limited airflow under the slab. Our standard way to address this problem would not be feasible because of the need…
A-Z Solutions Inc. was contracted to remediate a 130,000 square foot manufacturing facility.In order to accommodate client requests, a large part of the work was completed on the outside of the building in order to not interrupt daily activity inside the building. This was accomplished by using a proprietary remediation technique involving horizontal boring. Five separate…
A-Z Solutions, Inc. was contracted to design and install a vapor mitigation system in 5 buildings adjacent to a former manufacturing facility totaling approximately 150,000 square feet. The buildings were being used for warehouses, manufacturing facilities, as well as a day care facility. A-Z Solutions, Inc. was challenged with designing 5 separate vapor intrusion systems…
The property was a five story multifamily building totaling 120,000 square feet located in Ohio. A-Z Solutions, Inc. issued a radon test report indicating elevated levels of radon gas measuring 10.0pCi/L were found in the building. It was therefore recommended that the building install a radon mitigation system. There was an existing passive radon system…