A-Z Solutions was contracted to remediate a 350,000 square feet rubber manufacturing facility in the Ohio.  As part of the project, the crew was to create a negative pressure field around machine pits that were constructed virtually on top of the underground water table. The installation had to be completed within 30 days from start date.  Our experienced staff was dedicated to designing and installing a system that would be functional and achieve the clients’ objectives. The project was completed on time and final pressure readings were better than the minimum .020 negative pressure differential that was required in the initial scope of work.